Critical Risks
Geotechnical instability, pit wall failure, heavy vehicle interaction, energy isolation (LOTO), confined spaces, working at height, hazardous substances (cyanide), and explosives.
Core risks, controls, induction, and data-driven assurance for PNG mines.
Geotechnical instability, pit wall failure, heavy vehicle interaction, energy isolation (LOTO), confined spaces, working at height, hazardous substances (cyanide), and explosives.
Bow-tie analysis, critical control verification (CCV) schedules, pre-start checks, exclusion zones, spotter systems, tyres & rims procedures, isolation registers, and permit-to-work.
Site-wide induction, role-specific SOPs, task observations (TBT/JSA), competency sign-offs, and licence/permit matrices aligned to contractor management.
Pre-qualification, bridging documents, mobilisation checklists, onboarding, supervision plans, and routine performance reviews against safety KPIs.
ER plans, muster points, ICS roles, mutual aid, scenario drills (fire, medical, HAZMAT, slope failure), debriefs, and improvement actions tracked to closure.
Incident/NM/HPI reporting, causal analysis (5-Why, ICAM), safety alerts, campaign themes, and cross-site learnings embedded into SOP updates.
Matrix-based training plans linked to roles and risks; refresher cycles; verification of competency (VOC) and supervisor coaching in field leadership.
Planned task observations, CCV audits, lead/lag KPIs (TRIFR, HIRAC quality, actions overdue), and simple dashboards for weekly leadership reviews.
From Cert I–III field basics to Cert IV supervisory control and Diploma leadership in risk, assurance, and culture.